Weichao Project smooth start
After a thorough pre-arrangements and preparations the standard workshop project locate in Fenpu Industrial Park smooth started.The project with a total land area of 98,125 square meters, with a total area of 58,000 square meters, with a total construction area of 74340 square meters. Number 1 and number 2 are the three-story factory building, floor height is 6.2 meters, 5.4 meters, 3.6 meters; numbr 3-7 are single-storey factory (part two), floor height is 9 meters, 4.5 meters. The project designed and built with high standards, both for storage and logistics company, is suitable for logistics company and manufacturing enterprises settled in, the project intended to be completed before the end of March 2010.